Basement Project: Slope in concrete in Office leveled

Basement Project Add comments
Basement Office - Concrete Leveled

Basement Office - Concrete Leveled

Last weekend I leveled a slope to the concrete in the corner of the Office.  The slope was initially placed into the floor to slope it down to the sump pump opening.  Since I boxed around the sump opening pretty tightly there was a section that was still reveled the slope down to the sump opening.

I used a product from Mapei designed to level concrete floors prior to putting down ceramic tile.

I am happy with the results… I now have the carpet for the room on order and with a little luck it will be installed next week.