Last weekend I leveled a slope to the concrete in the corner of the Office. The slope was initially placed into the floor to slope it down to the sump pump opening. Since I boxed around the sump opening pretty tightly there was a section that was still reveled the slope down to the sump opening.
I used a product from Mapei designed to level concrete floors prior to putting down ceramic tile.
I am happy with the results… I now have the carpet for the room on order and with a little luck it will be installed next week.